From start to finish the service was outstanding. Professional, reliable and great communication. Highly recommend Stockholms Roofing!

Loft Insulation Specialists across the North West.
- Over 15 Years Experience
- 800+ Jobs Completed Across the North West
- Prices Start From £450
BBA-Approved Materials
Welsh slate, Marley, Tyvek and VELUX. Manufacturer-backed cover up to 75 years on tile.
Senior Roofer, Quote To Install
The roofer who quotes your work runs the install. The number you ring is the number you get.
Insurance-Backed 10-Yr Warranty
Workmanship warranty plus manufacturer cover. Honoured even if we one day stopped trading.
06:00 to 20:00, Every Day
Seven days a week. Urgent leak callouts attended within 48 hours where we can.
Service spec
Loft Insulation · what you get
Materials we run
- ·Knauf mineral wool 270mm
- ·Rockwool
- ·Foil-backed insulation board
Warranty
- 5-year workmanship guarantee
- Manufacturer cover 25 to 50 years
- Insurance-backed via FMB
Lead time
1 to 2 weeks
Indicative pricing
From £450 typical loft
Free inspection · No-obligation quote
Loft Insulation pricing
Indicative ranges based on the work we do most weeks. Every quote is written, itemised, and fixed before we lift a tile.
From £450 typical loft
Free inspection · No-obligation quote · Materials and warranty included
What our customers say
Excellent workmanship and very honest advice. They went above and beyond and the roof looks fantastic. Thank you!
Quick response, fair price and quality work. Will definitely use again and recommend to anyone.
Recent loft insulation work
CH47
Mineral wool top-up to current regs, Hoylake
Existing loft had 100mm of old fibreglass. Topped up to 270mm Knauf mineral wool to meet current Part L building regs and improve EPC rating.
- Scaffold
- No external scaffold required
- Duration
- 1 working day
- Materials
- Knauf mineral wool 270mm
CH7
ECO4 grant-funded install, Mold
Owner qualified for ECO4 grant funding through her energy supplier. Full survey, registration and install at zero cost to the owner. 270mm mineral wool throughout.
- Scaffold
- No external scaffold required
- Duration
- 1 working day
- Materials
- Rockwool mineral wool 270mm
CW1
Full mineral wool install to bare joists, Crewe
New-build top-up where the developer had only put down 150mm. Stripped existing, fitted Knauf 270mm, plus rigid foil-backed board over part of the loft for boarded storage.
- Scaffold
- No external scaffold required
- Duration
- 2 working days
- Materials
- Knauf mineral wool 270mm, Foil-backed insulation board, Loft boarding
Backed three ways
5-year workmanship guarantee
Every install we run is backed by a workmanship guarantee. If anything fails because of how we built it, we put it right.
25 to 50 year materials warranty
Manufacturer-backed warranty on every tile, sheet, fastener and membrane we install. Approved installer status means you get the longest cover available.
Insurance-backed work
Public liability and FMB-backed cover means your investment is protected even in the unlikely event we step away from the trade.
A poorly insulated loft is the single easiest heat loss to fix on a typical UK semi or detached house. Heat rises, and if there is less than 270mm of mineral wool between the ceiling joists and the cold air above it, you are heating the street as much as the house. Building Regs Part L sets 270mm as the minimum for new work; EcoFlex recommend 400mm for optimal thermal performance. Most pre-2000 houses in the L, CH, LL and WA postcode areas are sitting on 100mm or less.
We fit glass mineral wool (Isover or Knauf), rigid PIR board (Kingspan TP10 or Recticel Eurothane), or a combination of both depending on the loft type. Cold lofts, warm lofts, cut-rafter roofs, and trussed-rafter roofs all have different requirements. We assess which is appropriate before quoting.
What we fit and why
For a standard cold loft on a trussed-rafter roof, the spec is two layers of Isover or Knauf glass mineral wool: 100mm between the joists and 170mm across the top at 90 degrees, giving the 270mm minimum. Rolling the second layer at right angles avoids the thermal bridging that single-layer installs let through at the joist position.
For warm loft conversions where the insulation goes between and below the rafters, we fit Kingspan TP10 or Recticel Eurothane rigid PIR board. PIR achieves a lower U-value per millimetre than mineral wool, which matters when rafter depth is limited. On a 100mm rafter, 90mm PIR between and 50mm PIR below achieves Part L compliance; the same performance with mineral wool is not physically possible in that depth.
Ventilation and vapour control
Cold-loft insulation must leave a minimum 50mm clear airspace between the top of the insulation and the underside of the roof covering to allow air movement. This is not optional; without it, condensation builds on the cold timber and you trade heat loss for a rot problem. We check the eaves ventilation before laying and advise on any remedial ventilation work needed.
Warm-rafter insulation requires a vapour control layer on the warm side of the insulation to stop interstitial condensation forming within the rafter depth. We install Intello or Pro Clima VCL taped at all joints and laps. This is frequently missed on retrofit installations and is the cause of most premature degradation in warm-rafter insulation systems.
What it costs
Cold loft insulation at 270mm on a standard three-bedroom semi typically runs between £400 and £700 plus VAT, including clearing and reinstating loft boards where access is needed. Warm rafter insulation as part of a loft conversion scope is included in the conversion quote. Standalone warm rafter retrofits are quoted on survey as they depend heavily on rafter depth, roof area and access.
What we back it with
All insulation work carries a 5-year workmanship guarantee. Mineral wool is guaranteed inert for 50 years by Isover and Knauf. PIR board carries a 25-year thermal performance guarantee from Kingspan. We also provide a Part L compliance certificate for any insulation that forms part of a building regulations submission.
How we work
Six clear steps from first call to finished roof. Designed to remove every common surprise.
- 01
Call, text or email
Tell us what you need. We pick up between 06:00 and 20:00, seven days a week.
- 02
Arrange a date
We agree a time that works for you. No pressure, no chase calls.
- 03
Free roof inspection
A senior roofer attends, gets up the ladder, and checks every detail in person.
- 04
Honest, best advice
We tell you what really needs doing, what can wait, and what we would skip.
- 05
Clear quote, no hidden costs
Itemised, written, fixed. The price you see is the price you pay.
- 06
Quality work, built to last
BBA-approved materials, manufacturer-backed warranties, our 10-year workmanship guarantee.
Why choose us
Why choose Stockholms Roofing for loft insulation
Independent roofers covering Liverpool, Wirral, Chester, Cheshire and the North Wales coast. BBA, Marley, VELUX, Andura and CURE IT approved.
- BBA-Approved Installer
- 5.0 Google Rated
- 06:00 to 20:00, Every Day
- Free Site Inspections
- 10-Year Workmanship Warranty
- Fully Insured Cover
- Marley and VELUX Approved
- Same Team, Quote To Install

